We were instructed to install a new septic tank system.
We excavated and removed from site, 15m3 of spoil.
We then poured a reinforced concrete base pad with anchor points.
The tank was lowered in with one of our machines.
The tank was then strapped to both anchor points, filled with water and incased with 6m3 of concrete.