Large Bespoke Detached House – PO9
Large Bespoke Detached House – PO9
Large Bespoke Detached House – PO9
4 & 5 bedroom houses built for a local developer in the heart of West Sussex – West Chiltington
Emsworth – Concrete and Oversite Preparation – PO10
Bosham – Steel Installation – PO18
Bosham – Excavation – PO18
Retaining Wall Reinstatement – Chichester PO19
Raft Foundation – Lovedean, Hampshire
Underpinning – Rowlands Castle PO9
Demolition of the existing brickwork to allow for a new extension to be built on this property in Arundel We were instructed by the temporary works engineer to install propping and steel needles through the existing wall. We then braced this with scaffolding. This then enabled us to remove the masonry below. We then exposed […]
Demolition with our plant machinery and breaker attachment in Arundel BN18. On this job we’re are breaking out an existing block and beam floor to achieve a lower Finish floor level. One of our groundworks teams cut out the beams and broke out the blocks. After we had excavated through the hardcore we began to […]
Excavating with our plant machinery in Arundel BN180NJ. On this site we are excavating service trenches for electric, water and BT. We are digging to depth, installing ducting, building in BT quad boxes and electric draw pits ready for the utilities to turn on live. We work closely with the likes of Portsmouth water and […]
Excavating for new strip foundations ready for mass concrete pour in Emsworth. The ground conditions were hard being clay especially working through the heat wave. This element of the project being this size should take 2 days. With the conditions we were up against it turned in to a 5 day dig. We have proposed […]
Substructure blockwork, Shopwyke Lakes, Chichester, PO20 On this site we are forming the substructure brick and block work for 86 units. We build the block work to a specific height ready for block and beam floor and drainage to be installed. The outside skin gets built up in face brick work to DPC height.
Septic tank installation, Jury Lane, Sidlesham, PO20 We were instructed to install a new septic tank system. We excavated and removed from site, 15m3 of spoil. We then poured a reinforced concrete base pad with anchor points. The tank was lowered in with one of our machines. The tank was then strapped to both anchor […]
6 inch Clay Drainage On this Phase of a New build site in Arundel where KST Ltd is principal contracting, we are installing new clay drainage for 4 dwellings. We excavated, laid new clay pipe, backfilled with 10mm pea shingle and constructed the new inspection chamber’s. The drainage was inspected. We then filled the […]
Underpinning works, Arun Road, Bognor Regis, PO21 On this Project we underpinned the rear and side elevation of the property. The existing depths of the foundations did not meet regulations. We exposed existing then excavated under the current concrete and installed new concrete foundations.
Block and beam works in Bepton, Midhurst, GU29 On this site we have a block and beam floor that we installed in Midhurst West Sussex. We excavated for new trenches, poured the concrete foundations and built the substructure block work ready for the beams. The beams were dropped in with one of our machines and […]
Excavating works in Fontwell, West Sussex, BN18 On this site we are excavating, removing from site and pouring concrete foundations. Once the groundwork aspect is complete it will be handed over to KST Brickwork to build.
Floor construction in Church Norton, PO20 Here we have a 15.8 m3 Solid fill oversite pour. Prepped, poured and finished by KST Groundworks.
Hardlandscaping to a property in Sea Avenue, Rustington On this project we carried out a full landscape. Complimenting its surroundings with a buff Indian sand stone, Staffordshire blue brickwork and new fencing through out. A very happy Home owner.