On this Phase of a New build site in Arundel where KST Ltd is principal contracting, we are installing new clay drainage for 4 dwellings.
We excavated, laid new clay pipe, backfilled with 10mm pea shingle and constructed the new inspection chamber’s.
The drainage was inspected. We then filled the trenches with well compacted material.